Case Study · SGA2024008
PPC for CAISO / SCE Grid Compliance BESS
Single-point BESS controller for SCE and CAISO compliance in California.
InternationalCAISOUSABESS PPC
65 MW
BESS
130 MWh
Storage
50 ms
Control
Outcomes
- 50 ms control loop, 30 ms POI meter polling
- Full SCE and CAISO EMS setpoint compliance
- Redundant communications with full audit traceability
Solutions: SGA PPC • Honeywell SCADA • CAISO • SCE
Status: Coming Soon
Published by Smartgrid Analytics. View all case studies