Case Study · SGA2024005
Peak Demand Optimization Through EMS
Aligning solar generation with peak loads to reduce costs.
SolarDemand ResponseEMS
0.5 MW
Solar PV
2 MW
BESS
Auto DR
Control
Outcomes
- Lower peak demand charges and reduced energy costs
- Increased solar utilisation, minimal grid dependence
- Flexible load control via automated demand response
Solutions: EMS • Demand Response • Solar Optimisation
Published by Smartgrid Analytics. View all case studies