Case Study · SGA2024002
Hybrid EMS for Peak Power Management
Stable peak-power delivery across solar, wind, and storage.
BESSEMSIndiaHybrid
322 MW
Wind
81 MW
Solar
150 MWh
BESS
Outcomes
- Improved grid stability, reduced output volatility
- Optimised dispatch for higher overall efficiency
- New benchmark for hybrid peak-power management
Solutions: Hybrid EMS • Peak Shaving • Spinning Reserve