Case Study · SGA2024002

Hybrid EMS for Peak Power Management

Stable peak-power delivery across solar, wind, and storage.

BESSEMSIndiaHybrid

322 MW

Wind

81 MW

Solar

150 MWh

BESS

Outcomes

  • Improved grid stability, reduced output volatility
  • Optimised dispatch for higher overall efficiency
  • New benchmark for hybrid peak-power management

Solutions: Hybrid EMS • Peak Shaving • Spinning Reserve

Published by Smartgrid Analytics. View all case studies

Want to see what Solvyn can do for your plant?

Talk to our team about your asset type, grid environment, and commercial objectives.

Renewable energy infrastructure illustration