Case Study · SGA2024009
4-Layer Hybrid EMS for Kurnool 405 MW
Beyond the standard hybrid model, four-layer control architecture.
HybridAURA405 MWIndia
244 MW
Wind
242 MW
Solar
210 MWh
BESS
Outcomes
- Plant-level and sub-plant active power scheduling
- Reactive power unification with full CEA compliance
- AURA-driven DAM/RTM revenue optimization
Solutions: AURA • Hybrid EMS • SCADA • CEA • DSM
Status: Coming Soon
Published by Smartgrid Analytics. View all case studies
