Case Study: SGA2024001

INDIA'S FIRST
EMS DEPLOYMENT

A landmark Energy Management System (EMS) project that redefined renewable storage in India.


Project Scope

A 40MW/120MWh Battery Energy Storage System (BESS) integrated with a 100MW Solar PV
plant required an advanced EMS to ensure solar-only charging, support fluctuation control,
optimize charge/discharge cycles, and comply with

SGA Solution

To address these unique challenges, Smart Grid Analytics deployed a comprehensive EMS platform designed to maximize efficiency and reliability. The solution included:

  • EMS and BESS control for optimized charge/discharge management
  • Active power control with dynamic setpoints
  • Peak shaving, peak shifting, and power curve smoothing

Outcome

The deployment delivered measurable impact and set a new benchmark for India’s clean energy sector. It resulted in:

  • Stable power generation with dynamic load balancing
  • Reduced grid dependency and enhanced self-sufficiency
  • The first-ever EMS deployment in India, setting a new industry benchmark
  • Proof that large-scale renewable storage can be both reliable and regulation-compliant

400

+

Projects
Executed

85

+

GW
Handled

20

+

Grid Codes
Compliant

WHAT MAKES US STAND OUT FROM THE REST?

Truly Agnostic

TRULY
AGNOSTIC

Modular and Scalable

MODULAR AND
SCALABLE

Seamless Integration

SEAMLESS
INTEGRATION

Rapid Innovation

RAPID
INNOVATION

Proven Track Record

PROVEN
TRACK-RECORD

Future-Ready

FUTURE-READY

Talk to us today!

Email: info@sgrids.io
Contact: +91 8883772216

Follow us on LinkedIn for
the latest trends and updates

ADDRESS:

Smart Grid Analytics Private Limited
Msm Plaza, 2nd floor, service rd, opp. Kallumantapa, Banaswadi, Bangalore, Karnataka – 560043

Find us !