A large-scale hybrid site — featuring a 150 MWh BESS, 81 MW Solar PV, and 322 MW Wind — required seamless integration to manage peak demand, deliver fluctuation-free dispatch, and provide instant backup reserves for grid stability.
To achieve these goals, Smart Grid Analytics implemented a unified EMS that coordinated generation and storage in real time through:
The deployment delivered measurable operational and financial benefits, including:
An advanced hybrid integration proving that large-scale peak power can be predictable, compliant, and profitable.
Projects
Executed
GW
Handled
Grid Codes
Compliant
TRULY
AGNOSTIC
MODULAR AND
SCALABLE
SEAMLESS
INTEGRATION
RAPID
INNOVATION
PROVEN
TRACK-RECORD
FUTURE-READY